Frequently Asked Questions
How to choose a bending machine?
Please provide details regarding the material of your plate, the maximum thickness, the maximum plate width, and if possible, specify the model you prefer.
Where is the factory located? How can I get there?
You can fly directly to Nanjing Lukou Airport, where we will pick you up. All customers from domestic regions and abroad are warmly welcome to visit.
How is quality ensured in the factory?
Quality control is prioritised from the start to the end. The manufacturing processes have achieved both ISO and CE certifications.
What are the available payment methods?
Payments can be made via T/T, Western Union, MoneyGram, or PayPal. A 30% deposit is required, with the remaining 70% balance paid before shipment.
How long does production take?
The standard production and delivery time ranges between 15 and 35 days.
What synchronisation and drive technologies are used?
The machinery incorporates a mechanical torque system to guarantee cylinder synchronisation and adopts a hybrid drive of electric and hydraulic systems to achieve fast cycle speeds and save up to 60% of energy.