Seasonal differences, different climate zones - your products must be able to withstand various temperatures during manufacturing, transportation, storage and use. Our Temperature Humidity Test Chamber will help you to test the effects of temperature and humidity on the characteristics, functions and service life of your products under accelerated conditions.
Our environmental test chambers and constant temperature and humidity test chambers support a wide range of applications, allowing you to accurately control temperatures from -70°C to +180°C and relative humidity from 10% to 98%.
| Parameter Item | Details / Values | |
|---|---|---|
| Model | ST/180/70(H) | |
| System | Temperature and Humidity Balance Control (BTHC) System | |
| Test area capacity | 180L | |
| Test area load-bearing capacity | 30KG | |
| Internal dimensions W×H×D mm | 580*750*450 | |
| Dimensions W×H×D mm | 800*1800*1570 | |
| Weight | 520kg | |
| Power | 1φ220V AC & 50/60Hz, 24A or 3φ380V AC & 50/60Hz, 10A | |
| Performance | Temp. & Humid. Range | -70~+100℃ (+150℃/+180℃) / 10~98%rh |
| Temp. & Humid. Fluctuations | ±0.3°C / ±2.5%rh | |
| Temperature uniformity | 1.5°C | |
| Temperature change rate | Heating rate: 3.0°C/min | Cooling rate: 2.0°C/min | |
| Extreme temp. reach time | Heating: +20 to +100℃ in 30 mins | Cooling: +20 to -20°C in 20 mins | |
| Allowable heat load | Test area temperature +20°C: 300 W | |
| Refrigeration Unit | System | Mechanical single-stage compression cooling |
| Compressor | Scroll / Piston Compressor | |
| Refrigerant | R404A [R449A available on request] | |
| Power | 4.8 Kw | |
| Noise level | 68dB | |
|
*1 Performance values based on IEC60068-3-5:2001 and IEC60068-3-6:2001. Performance data is given at +23°C ambient temperature, 65±20%rh relative humidity, rated voltage and no samples in the test area. *2 Minimum temperature attainable at ambient temperature +5 to +30°C. *3 When the temperature inside the chamber is +20℃. |
||
Established in 1995 with European technologies, our manufacturing firm received significant capital investment in 2016 to expand production capabilities. With more than two decades of dedicated development in the environmental test chamber industry, our own manufacturing facility built in 2006 now reaches 12,000 square meters. This scale allows us to provide global clients with comprehensive, one-stop products and services spanning R&D, sheet metal processing, mass production, technical support, rental services, internal laboratory testing, and export operations.